Follow CBS_Satfacts on Twitter
My Tweets-
Recent Posts
Previous Productions
Search Content
Meta
Previous Production’s Info
Category Archives: Uncategorized
Coppelia TX
Performance finishes and black to line at 17:38 GMT. Services down at 17:44
Posted in Uncategorized
Comments Off on Coppelia TX
Copprlia TX
16:04 GMT Total loss on IS10-02 for 10 seconds just before start of Act 2
Posted in Uncategorized
Comments Off on Copprlia TX
Coppelia TX
All Services established at 12:02 GMT. IS10-02 unstable until 12:15 GMT
Posted in Uncategorized
Comments Off on Coppelia TX
Coppelia TX
Pre TX testing begins at 12:00GMT – 13:00BST – 14:00CEST. Helpline operational from 11:45GMT. Remember, this is a DVB S2 8PSK transmission
Posted in Uncategorized
Comments Off on Coppelia TX
Coppelia Test
08:30 GMT . All services established and stable, although AB3 was a liitle late at 08:34 GMT
Posted in Uncategorized
Comments Off on Coppelia Test
Coppelia Test
Testing on IS10-02 and AB3 begins at 08:30 GMT / 09:30 BST / 10:30 CEST. Helpine available from 08:15GMT. Remember, this is a DVB S2 / 8PSK transmission.
Posted in Uncategorized
Comments Off on Coppelia Test
Met: Die Walkure TX
All services down at 22:04 GMT
Posted in Uncategorized
Comments Off on Met: Die Walkure TX
Met: Die Walkure TX
An explanation for the delayed start will be given during the intermission.
Posted in Uncategorized
Comments Off on Met: Die Walkure TX
Met: Die Walkure TX
Current information from the USA suggests that the intervals / intermissions will remain as scheduled, meaning the predicted finish times (although still unconfirmed) 22:05 GMT / 23:05 BST and 00:05 CEST are likely to be accurate.
Posted in Uncategorized
Comments Off on Met: Die Walkure TX