
UPDATE@19:30BST There are NO SUBTITLES for this production
The feed for “Romeo and Juliette” is now stable on IS-1002 and E5Wa.
The Pathé Live loop will play to 19:10BST, followed by the Walk-In and then Act-I from 1932BST.

UPDATE@19:30BST There are NO SUBTITLES for this production
The feed for “Romeo and Juliette” is now stable on IS-1002 and E5Wa.
The Pathé Live loop will play to 19:10BST, followed by the Walk-In and then Act-I from 1932BST.

UPDATE@1735BST. The feed is stable on both satellites. The Test runs until 1845BST and the performance is due to end at 2230BST
This morning’s Test starts at 1100BST/UK (1200CEST/W.Europe). It lasts for 60′ and is carried on IS-1002 and IS-905. The Helpline will be operational for this period too.

UPDATE@1103: The Test feed is now stable on both IS-1002 and IS-905. The helpline is operational too.
The Test on IS-1002 and IS-905 starts at 1100BST/1200CEST. It is for 60′.
The content is 1080/50 AC3/DD.

UPDATE@0935BST. After a successful Test transmission on E5Wa, we are now live on IS-1002 and IS-905
The Test on E5Wa starts at 0730GMT/0930CEST, followed by the Test on IS-1002 and IS-905 at 0930BST. Both last for 60′ and are of the Pathé Live Test Loop

Good morning All.
The Test is now live on IS-1002, IS-905 and E5Wa. It is for 60′ duration until 1200BST/1300CEST. Embedded subtitles are available throughout.
UPDATE@1504BST. The feed is now up and stable on all paths.
The Test period for the 1st production of the 2016-17 Season will start at 1500BST/1600CEST. The feed is carried on IS-1002 , IS-905 and E5Wa.
The Walk-In starts at 1655BST.

UPDATE@0836BST. The Pathé Live Test-loop feed is now stable on both satellites.
The Test (60′ duration starts) at 0830BST / 0930CEST and is available on IS-1002 and E5Wa
Service established on IS10-02 at 09:25BST
Service ceased at 10:00BST
Services on both IS10-02 & IS905 are established & stable at 12:50BST (UK time)
Services ceased – Clean & stable TX

UPDATE@1730BST. “Cymbeline” is now stable on both IS-1002 and IS-905. The Helplines are operational too.
The Test will start at 1100BST/UK (1200 CEST/W.Europe) and be for 60′. It is on IS-1002 and additionally on IS-905.