BOLSHOI BALLET “The Golden Age” Test 11th October

bolshoi-logo

UPDATE@0935BST. After a successful Test transmission on E5Wa, we are now live on IS-1002 and IS-905

The Test on E5Wa starts at 0730GMT/0930CEST, followed by the Test on IS-1002 and IS-905 at 0930BST. Both last for 60′ and are of the Pathé Live Test Loop

Posted in Pathe live | Tagged , , , | Comments Off on BOLSHOI BALLET “The Golden Age” Test 11th October

ROYAL OPERA HOUSE “Cosi Fan Tutti” Test 10th October

 

cosifantutte

Good morning All.

The Test is now live on IS-1002, IS-905 and E5Wa. It is for 60′ duration until 1200BST/1300CEST. Embedded subtitles are available throughout.

Posted in ROH | Tagged , , , | Comments Off on ROYAL OPERA HOUSE “Cosi Fan Tutti” Test 10th October

MET OPERA “Tristan Und Isolde” 8th October 2016

UPDATE@1504BST. The feed is now up and stable on all paths.

The Test period for the 1st production of the 2016-17 Season will start at 1500BST/1600CEST. The feed is carried on IS-1002 , IS-905 and E5Wa.

The Walk-In starts at 1655BST.

Posted in Met Opera | Tagged , , | Comments Off on MET OPERA “Tristan Und Isolde” 8th October 2016

PATHÉ LIVE “Comédie-Française” Test 5th October

pl_cf

UPDATE@0836BST. The Pathé Live Test-loop feed is now stable on both satellites.

The Test (60′ duration starts) at 0830BST / 0930CEST and is available on IS-1002 and E5Wa

 

Posted in Pathe live | Tagged | Comments Off on PATHÉ LIVE “Comédie-Française” Test 5th October

Met Opera ‘Tristan’ – Test

Service established on IS10-02 at 09:25BST
Service ceased at 10:00BST

Posted in Met Opera | Comments Off on Met Opera ‘Tristan’ – Test

ROYAL OPERA HOUSE “Norma” Encore. 2nd October

Services on both IS10-02 & IS905 are established & stable at 12:50BST (UK time)

Services ceased – Clean & stable TX

Posted in ROH | Tagged , , | Comments Off on ROYAL OPERA HOUSE “Norma” Encore. 2nd October

RSC “Cymbeline” 28th September

cymbeline-production-photos_-may-2016_2016_photo-by-ellie-kurttz-_c_-rsc_193858-tmb-gal-670

UPDATE@1730BST. “Cymbeline” is now stable on both IS-1002 and IS-905. The Helplines are operational too.

The Test will start at 1100BST/UK (1200 CEST/W.Europe) and be for 60′. It is on IS-1002 and additionally on IS-905.

Posted in RSC | Tagged , , , | Comments Off on RSC “Cymbeline” 28th September

RSC “Cymbeline” Test 27th September

cymbeline-production-photos_-may-2016_2016_photo-by-ellie-kurttz-_c_-rsc_193858-tmb-gal-670

UPDATE@11:02BST. The feed is now up and stable on both satellites

The Test for “Cymbeline” will start at 1100BST/1200CEST and last for 60′. The feed will be available on IS-905 and as always it is definately on Is-1002.

There are NO subtitles.

Posted in RSC | Tagged , , | Comments Off on RSC “Cymbeline” Test 27th September

ROYAL OPERA HOUSE “Norma” 26th September

picture-caption

The Test period started at 1000BST/1100CEST for 60′. The feed is carried on E5Wa, IS-905 and of course the ubiquitous IS-1002. The feed is currently stable on all three carriers

Posted in ROH | Tagged , , , | Comments Off on ROYAL OPERA HOUSE “Norma” 26th September

MET OPERA German Pre-Season Test 26th Sept

download

The pre-season test for the IS-1002 feed with BURNT-IN German subtitles is live from 1030CEST for 30′

Posted in Met Opera | Tagged , , , | Comments Off on MET OPERA German Pre-Season Test 26th Sept