NT Live – Jane Eyre – TX

22:26 Services ceased – clean & stable TX
22:24 Content concludes
20:12GMT: The interval and hence the end time will be extended by 7 minutes.

Services established & stable 16:50GMT
The test period begins at 17:00GMT(UK)/18:00CET

Posted in NT Live | Tagged , | Comments Off on NT Live – Jane Eyre – TX

NT Live – Jane Eyre – Test

Services ceased at 12:00GMT
Both services established & stable at 11:00GMT
The test period will begin at 11:00GMT (UK time) / 12:00CET& will last for 60 minutes

Posted in NT Live | Tagged , , | Comments Off on NT Live – Jane Eyre – Test

BOLSHOI BALLET: The Lady Of The Camellias – TX

Services ceased at 18:18GMT
Content concludes 18:15GMT
All European services established & stable 13:00GMT
The tuning period will begin at 13:00GMT (UK Time) / 14:00CET (European time)

Posted in BOLSHOI | Tagged , , , | Comments Off on BOLSHOI BALLET: The Lady Of The Camellias – TX

ENO “Mikado” Main Transmission 3rd December

The feeds on IS-905 and IS-1002 are now both established and stable.

Pre-Show trailers run from 1900-1925GMT, followed by Intro and then the “Mikado” at 1930.

Posted in ENO, Uncategorized | Tagged , | Comments Off on ENO “Mikado” Main Transmission 3rd December

ENO “Mikado” Test 3rd December

UPDATE at 12:51: The ENO have stopped sending audio. we do not know why!

UPDATE at 1337GMT: The feed is up on both satellites. Please note: the extracts form the opera are STEREO only at this time.

The Test runs from 1230GMT to 1330GMT on IS-905 and IS-1002

Posted in ENO, Uncategorized | Tagged , , , | Comments Off on ENO “Mikado” Test 3rd December

ENO:MIKADO Test 1st December

The Test is now live on IS-1002 and IS-905. Is is live until 1330UK/1430CET

Although the live opera will have subtitles there are no subtitles on the Test

Posted in ENO, Uncategorized | Tagged , , | Comments Off on ENO:MIKADO Test 1st December

BOLSHOI BALLET: Test 1st December

This morning we are Testing for the “Lady of the Camellias”.

The 1st Test is on E5Wa at0830GMT/0930CET for 60′. This is followed at 1100-1200 on IS-1002.

Any significant info. during the Test will appear above here.

Posted in BOLSHOI | Tagged , , , | Comments Off on BOLSHOI BALLET: Test 1st December

Branagh Theatre Live Main Transmission

17:30GMT: The live broadcast Test is now on IS-1002 and IS-905. The signal is clean and stable.

 

Posted in Branagh | Tagged , , | Comments Off on Branagh Theatre Live Main Transmission

Branagh Theatre Live: “A Winters Tale” Test am 26th

The Test will start at 1100GMT/1200CET and will be for 60′. It will be on IS-1002 and IS-905.

There are replacement  elements from yesterday’s test. Please not that on the 5.1 channel-ident part there are some clicks as the speaker changes

A REMINDER: The picture is the normal 1920×1080 16:9 raster with an active picture area aspect ratio of 1:2.35 

Posted in Branagh, Uncategorized | Tagged , , | Comments Off on Branagh Theatre Live: “A Winters Tale” Test am 26th

Kenneth Branagh Theatre Company: “A Winters Tale” Test 25th November

UPDATE 1200GMT: The Test has now ceased. Please come back at 1100GMT tomorrow.

UPDATE 1107GMT: Feeds on IS1002 and IS905 are now up and stable.

The Test on IS-1002 and IS-905 starts at 1100GMT/UK (1200CET/W.Europe) and is of 60′ duration.

The bespoke Test loop has various elements.

PLEASE NOTE: The audio on the 5.1 ident. loop has audio on L+R only, although the vision is indicating otherwise. This is NOT a fault with your equipment.

Posted in Branagh, Uncategorized | Tagged , | Comments Off on Kenneth Branagh Theatre Company: “A Winters Tale” Test 25th November