The feeds on IS-905 and IS-1002 are now both established and stable.
Pre-Show trailers run from 1900-1925GMT, followed by Intro and then the “Mikado” at 1930.
The feeds on IS-905 and IS-1002 are now both established and stable.
Pre-Show trailers run from 1900-1925GMT, followed by Intro and then the “Mikado” at 1930.
UPDATE at 12:51: The ENO have stopped sending audio. we do not know why!
UPDATE at 1337GMT: The feed is up on both satellites. Please note: the extracts form the opera are STEREO only at this time.
The Test runs from 1230GMT to 1330GMT on IS-905 and IS-1002
The Test is now live on IS-1002 and IS-905. Is is live until 1330UK/1430CET
Although the live opera will have subtitles there are no subtitles on the Test
This morning we are Testing for the “Lady of the Camellias”.
The 1st Test is on E5Wa at0830GMT/0930CET for 60′. This is followed at 1100-1200 on IS-1002.
Any significant info. during the Test will appear above here.
17:30GMT: The live broadcast Test is now on IS-1002 and IS-905. The signal is clean and stable.
The Test will start at 1100GMT/1200CET and will be for 60′. It will be on IS-1002 and IS-905.
There are replacement elements from yesterday’s test. Please not that on the 5.1 channel-ident part there are some clicks as the speaker changes
A REMINDER: The picture is the normal 1920×1080 16:9 raster with an active picture area aspect ratio of 1:2.35
UPDATE 1200GMT: The Test has now ceased. Please come back at 1100GMT tomorrow.
UPDATE 1107GMT: Feeds on IS1002 and IS905 are now up and stable.
The Test on IS-1002 and IS-905 starts at 1100GMT/UK (1200CET/W.Europe) and is of 60′ duration.
The bespoke Test loop has various elements.
PLEASE NOTE: The audio on the 5.1 ident. loop has audio on L+R only, although the vision is indicating otherwise. This is NOT a fault with your equipment.
Services ceased 21:45GMT – Clean & stable TX
Content concludes 21:42GMT
16:11GMT. All European feeds up, stable & correct
The tuning period begins at 16:00GMT (UK) / 17:00CET
The 30′ (up to 0900GMT/1000CET) and stable.
The test on IS-1002 starts at 0930GMT/1030CET and again for 30′
UPDATE@13:02GMT. Please bear with us. there are some issues accessing both IS-1002 and IS-905 satellites during this VERY busy period in Europe (viz: recent news events). The feeds will be there ASAP.
The feed on IS-1002 and IS-905 starts with Test content at 1300GMT/1400CET
The Countdown clock starts at 1340GMT/1440CET and the Introduction is at 1400GMT/1500CET.