Met Opera – Lulu TX

Services ceased 21:45GMT – Clean & stable TX
Content concludes 21:42GMT
16:11GMT. All European feeds up, stable & correct
The tuning period begins at 16:00GMT (UK) / 17:00CET

Posted in Met Opera | Tagged , | Comments Off on Met Opera – Lulu TX

MET OPERA: TEST 16th November

The 30′ (up to 0900GMT/1000CET) and stable.

The test on IS-1002 starts at 0930GMT/1030CET and again for 30′

Posted in Uncategorized | Comments Off on MET OPERA: TEST 16th November

ROYAL OPERA HOUSE: ROYAL BALLET ENCORE 15th November

UPDATE@13:02GMT. Please bear with us. there are some issues accessing both IS-1002 and IS-905 satellites during this VERY busy period in Europe (viz: recent news events). The feeds will be there ASAP.

The feed on IS-1002 and IS-905 starts with Test content at 1300GMT/1400CET

The Countdown clock starts at 1340GMT/1440CET and the Introduction is at 1400GMT/1500CET.

Posted in ROH | Tagged , , | Comments Off on ROYAL OPERA HOUSE: ROYAL BALLET ENCORE 15th November

ROYAL OPERA HOUSE: 12th November: Main TX

The feed is now established and stable on E5Wa, IS-1002 and IS-905.

Subtitles are embedded on each feed.

The end time is subject to the duration of the post-event speeches.

Posted in ROH | Tagged , , | Comments Off on ROYAL OPERA HOUSE: 12th November: Main TX

ROYAL OPERA HOUSE 12th November: Test

For the record: all feeds were stable at 1107GMT

The feed is now up and stable on IS-905 and E5Wa

The teleport has some issues getting the IS-1002 service working. Please bear with us

Posted in ROH | Tagged , , | Comments Off on ROYAL OPERA HOUSE 12th November: Test

ITV First Look: “Frankenstein Chronicles” Main Transmission

The feed is now live on IS-1002 and IS-905

Remember to call the conference bridge to confirm reception.

Posted in Uncategorized | Comments Off on ITV First Look: “Frankenstein Chronicles” Main Transmission

ITV First Look “Frankenstein Chronicles” 11th November

UPDATE@1000. The feed is now up and stable on both satellites.

The 60′ Test on IS-1002 and IS-905 starts at 1000GMT/UK. The Test content is a CBS bespoke test loop

This is a STEREO transmission.

Posted in Uncategorized | Tagged , , | Comments Off on ITV First Look “Frankenstein Chronicles” 11th November

RONALDO FILM: Transmission

UPDATE at 18:54 The subtitle Test-loop has been stopped. Subtitles will come back again when the Ronaldo Feature starts.

UPDATE at 18:48 There was a brief but major breakup from the OB

The feed is now live on IS-1002, IS-905 and E5Wa. Subtitle Tests are live too.

The sync Test will be intersperced with a 2′ Trailer loop

Posted in Uncategorized | Tagged | Comments Off on RONALDO FILM: Transmission

Ronaldo – 2nd Test

UPDATE: There is a 2nd  Test on IS1002 and IS905 from 1605-1630. It is the Feature we will be showing. This is a chance to retest your subtiltes

The test will begin at 11:00GMT (UK)/12:00CET. It will be on IS-1002, IS-905 and E5Wa with embedded subtitles. It lasts for 60′.

There will be a mixture of a sync-loop (with audio L+R only) and an excerpt from the feature (with full 5.1 Dolby Digital Surround Sound).

SWEDISH subtitle PID is now 1034

Posted in Uncategorized | Comments Off on Ronaldo – 2nd Test

ROYAL OPERA HOUSE: Test 5th November

UPDATE@11:04GMT The feed is now up and stable across all 3 satellites.

The 60′ Test on IS-1002, IS-905 and E5Wa starts at 1100GMT/1200CET.

Significant updates will appear here.

Posted in ROH | Tagged , | Comments Off on ROYAL OPERA HOUSE: Test 5th November