The feed is now established and stable on E5Wa, IS-1002 and IS-905.
Subtitles are embedded on each feed.
The end time is subject to the duration of the post-event speeches.
The feed is now established and stable on E5Wa, IS-1002 and IS-905.
Subtitles are embedded on each feed.
The end time is subject to the duration of the post-event speeches.
For the record: all feeds were stable at 1107GMT
The feed is now up and stable on IS-905 and E5Wa
The teleport has some issues getting the IS-1002 service working. Please bear with us
The feed is now live on IS-1002 and IS-905
Remember to call the conference bridge to confirm reception.
UPDATE@1000. The feed is now up and stable on both satellites.
The 60′ Test on IS-1002 and IS-905 starts at 1000GMT/UK. The Test content is a CBS bespoke test loop
This is a STEREO transmission.
UPDATE at 18:54 The subtitle Test-loop has been stopped. Subtitles will come back again when the Ronaldo Feature starts.
UPDATE at 18:48 There was a brief but major breakup from the OB
The feed is now live on IS-1002, IS-905 and E5Wa. Subtitle Tests are live too.
The sync Test will be intersperced with a 2′ Trailer loop
UPDATE: There is a 2nd Test on IS1002 and IS905 from 1605-1630. It is the Feature we will be showing. This is a chance to retest your subtiltes
The test will begin at 11:00GMT (UK)/12:00CET. It will be on IS-1002, IS-905 and E5Wa with embedded subtitles. It lasts for 60′.
There will be a mixture of a sync-loop (with audio L+R only) and an excerpt from the feature (with full 5.1 Dolby Digital Surround Sound).
SWEDISH subtitle PID is now 1034
UPDATE@11:04GMT The feed is now up and stable across all 3 satellites.
The 60′ Test on IS-1002, IS-905 and E5Wa starts at 1100GMT/1200CET.
Significant updates will appear here.
UPDATE 1215: There is now a static and mute holding card. The content should start at 1230.
UPDATE 09:26 The Test loop is now broadcasting on both satellites. A reminder again that it is STEREO only.
The Test will begin at 0930GMT on IS-1002 and IS-905. It will be the Arqiva “Digital Cinema Delivered” Test loop for 30′. This will be followed by 30′ of live shots from the venue.
UPDATE @ 10:58GMT. The feed is now up and stable on both satellites. It is STEREO-only. You made need to adjust your audio outputs from your receiver or the inputs to your processor to suit.
The Test for this event starts at 1100GMT/UK and is of 60′ duration carried on IS-1002 and IS-905
The content will be the Arqiva “Digital Cinema Delivered” test loop. It is STEREO only.
Services ceased at 20:55GMT – Clean & stable TX
Content concludes at 20:49GMT
All services established & stable at 14:30GMT
The tuning period begins at 14:30GMT (UK time) / 15:30CET