Gascoigne Q&A – TX

21:20BST Services ceased
21:15BST Content concludes
20:40BST – Content begins
20:32BST. Good audio on centre channel only – other channels muted
Audio still distorted – OB are aware and working on it at 18.58BST
Audio distortion from site – investigating
Services established & stable at 18:30BST (UK Time)

Posted in Uncategorized | Comments Off on Gascoigne Q&A – TX

Gascoigne Q&A – Test

Services ceased at 12:00BST
Services on both satellites established & stable 10.50BST
The test period will begin at 11:00BST (UK Time)

Posted in Uncategorized | Comments Off on Gascoigne Q&A – Test

ENO: Pirates of Penzance. Transmission 19th May

There was a break in the service on both satellites at 1840GMT/1940BST/2040CEST for around 15 seconds.

ENGLISH SUBTITLES: The official answer from the Distributor for English-speaking cinemas: “you can use them at your discretion”.

The feed is now live on IS-1002 and IS-905

Posted in Uncategorized | Comments Off on ENO: Pirates of Penzance. Transmission 19th May

ENO: Pirates of Penzance: TEST 18th May

UPDATE: 0951GMT. The Test-loop feed is up and stable on both satellites. There are NO SUBTITLES on this test feed

The Test for this event is at 1000GMT/1100BST~UK/1200CEST~W.Europe.

The Test loop will be on IS-100 and IS-905 and will be there for 60′. The content is the Arqiva “Digital Cinema Delivered” test loop.

Posted in ENO | Tagged | Comments Off on ENO: Pirates of Penzance: TEST 18th May

NT Live: Man & Superman

Services ceased at 21:35GMT – Clean & stable TX
Content concludes at 21:31GMT
IS905 established & stable at 16:00GMT
IS10-02 established & stable 15:51GMT
The tuning period will begin at 16:00GMT/17:00BST (UK)/18:00CEST

Posted in NT Live | Comments Off on NT Live: Man & Superman

NT Live: Man & Superman: TX test

Service ceased at 11:00GMT
5.1 channel assignment corrected 10:45GMT
IS905 Established & stable 09:58GMT
IS10-02 Established & stable 09:50GMT
The test period will begin at 10:00GMT/11:00BST (UK)/12:00CEST

Posted in NT Live | Comments Off on NT Live: Man & Superman: TX test

ROYAL OPERA HOUSE: Encore 10th May

13:05BST

Feed is up and stable on IS-905

Feed on IS-1002 is now on 11499V (Apologies to this change)

Posted in ROH | Tagged , | Comments Off on ROYAL OPERA HOUSE: Encore 10th May

Met Opera – Cavalleria Rusticana – TX

Services ceased at 20:00GMT
Content concludes at 19:55GMT
IS905 service established at 14:38GT following short delay
IS10-02 German content correct at 14:34GMT
IS10-02 German established at 14:30GMT but wrong content
IS10-02 All language service established at 14:29GMT
Eu5Wa Service established at 14:25GMT
The tuning period begins at 14:30GMT / 15:30BST (UK time) / 16:30 CEST

Posted in Met Opera | Comments Off on Met Opera – Cavalleria Rusticana – TX

Elaine Paige – TX

Services ceased at 20:32GMT
Content concludes at 20:30GMT
Both services established & stable 18:43GMT
The tuning period will begin at 18:45GMT / 19:45BST (UK Time) / 20:45CEST

Posted in Uncategorized | Comments Off on Elaine Paige – TX

Screen Live – Elaine Paige – Test

Services ceased at 09:30GMT
Feeds established & stable 08:21GMT
There will be feeds on IS-1002 and IS-905
The content will be the Arqiva “Digital cinema Delivered” Test loop.
The test period will begin at 08:30GMT / 09:30BST (UK time) /10:30CEST

Posted in Uncategorized | Comments Off on Screen Live – Elaine Paige – Test