Follow CBS_Satfacts on Twitter
My Tweets-
Recent Posts
Previous Productions
Search Content
Meta
Previous Production’s Info
Tag Archives: Satellite Test
MET OPERA: “Turandot” 30th January 2016
Good afternoon to all Met opera takers. The Test/Tuning period for services on IS-1002 (2 feeds), IS-905 and E5Wa starts at 1630GMT/1730CET. After the Walk-in from 17:5GMT, the pre-performance content starts at 1755GMT with TURANOT due to start at 1810.
Posted in Met Opera
Tagged Met Opera TX, Satellite Test, Satellite transmission
Comments Off on MET OPERA: “Turandot” 30th January 2016
NT Live – Les Liaisons Dangereuses – Test
Services ceased at 12:00GMT IS10-02 & IS905 established at 10:54GMT The test period will begin at 11:00GMT/12:00CET
Posted in NT Live
Tagged NT Live transmission, Satellite Test, Test
Comments Off on NT Live – Les Liaisons Dangereuses – Test
Bolshoi / Pathe: Taming of the Shrew
Services ceased at 17:10GMT. Clean & stable TX Content concludes 17:07GMT Good strong signals across Europe IS905 established & stable at 12:54GMT IS10-02 established & stable at 12:50GMT Eu5Wa established & stable at 12:49GMT The tuning period will begin at … Continue reading
Posted in BOLSHOI
Tagged Bolshoi, Pathe Live, Satellite Test, Satellite transmission, Transmission status
Comments Off on Bolshoi / Pathe: Taming of the Shrew
ROH – Rhapsody / Two Pigeons – Test
12:00GMT – All services ceased IS10-02 established at 10:58GMT IS905 established at 10:47GMT The test period begins at 11:00GMT (UK time) / 12:00CET
Posted in ROH
Tagged ROH, Satellite Test, Satellite transmission, Test, Transmission status
Comments Off on ROH – Rhapsody / Two Pigeons – Test
Bolshoi – La Megere – Test
10:30GMT IS10-02 & IS905 ceased 09:42 IS10-02 & IS905 established 09:40 Still awaiting IS906 & IS10-02. Talking to teleport 09:34 Still awaiting IS905 & IS10-02 09:31GMT Eu5Wa ceased 08:25GMT. Eu5Wa established & stable The test period for IS10-02 & IS905 begins at … Continue reading
Posted in BOLSHOI
Tagged Bolshoi, Satellite Test, Satellite transmission, Test, Transmission status
Comments Off on Bolshoi – La Megere – Test
MET OPERA “The Pearl Fishers” 16th January
UPDATE 16:35 All feeds are now up and stable. Call you local Helpline for further assistance. Good afternoon all Met Opera takers. The service is due to start at 1630GMT~UK/1730CET. The usual feeds on IS-1002 (all subs embedded), IS-905 … Continue reading
Posted in Met Opera
Tagged Met Opera TX, Satellite Test, Satellite transmission, Transmission status
Comments Off on MET OPERA “The Pearl Fishers” 16th January
Les Ballets de Monte-Carlo: Casse Noisette Compagnie MAIN TRANSMISSION
The feeds on IS-1002, IS-905 and E5Wa from Monte Carlo are now up and stable at 1800GMT/1900. Good c/n and margins recorded on all feeds. Further details to follow as required.
Posted in Uncategorized
Tagged Satellite Test, Satellite transmission, Transmission status
Comments Off on Les Ballets de Monte-Carlo: Casse Noisette Compagnie MAIN TRANSMISSION
Les Ballets de Monte-Carlo: Casse Noisette Compagnie
The Test ahead of the live broadcast tonight starts at 1030GMT/1130CET. It is for 30′ and carried on IS-1002, IS-905 and E5Wa.
Posted in Uncategorized
Tagged Satellite Test, Satellite transmission, Test, Transmission status
Comments Off on Les Ballets de Monte-Carlo: Casse Noisette Compagnie
ROH – Nutcracker test
12:00GMT Eu5Wa service ceased 10:53GMT Eu5Wa service established & stable 10:51GMT Services established & stable on IS10-02 & IS905 The hour test period will begin at 11:00GMT/12:00CET
ROYAL OPERA HOUSE: Cavalleria/Pagliacci ENCORE 13th December
The feed is now live and stable on IS-1002 and IS-905. The afternoon looks like this: 13:00 Test Period 13:40 Countdown Clock 14:00 Trailers and Introduction 14:15 Cavalleria Rusticana 15:32 Interval 15:47 Introduction 16:02 Pagliacci 17:23 Broadcast concludes
Posted in ROH
Tagged ROH, Satellite Test, Satellite transmission, Transmission status
Comments Off on ROYAL OPERA HOUSE: Cavalleria/Pagliacci ENCORE 13th December