Follow CBS_Satfacts on Twitter
My Tweets-
Recent Posts
Previous Productions
Search Content
Meta
Previous Production’s Info
Tag Archives: Transmission status
ENO “Mikado” Main Transmission 3rd December
The feeds on IS-905 and IS-1002 are now both established and stable. Pre-Show trailers run from 1900-1925GMT, followed by Intro and then the “Mikado” at 1930.
Posted in ENO, Uncategorized
Tagged Satellite transmission, Transmission status
Comments Off on ENO “Mikado” Main Transmission 3rd December
ENO “Mikado” Test 3rd December
UPDATE at 12:51: The ENO have stopped sending audio. we do not know why! UPDATE at 1337GMT: The feed is up on both satellites. Please note: the extracts form the opera are STEREO only at this time. The Test runs … Continue reading
Posted in ENO, Uncategorized
Tagged Satellite Test, Satellite transmission, Test, Transmission status
Comments Off on ENO “Mikado” Test 3rd December
Branagh Theatre Live Main Transmission
17:30GMT: The live broadcast Test is now on IS-1002 and IS-905. The signal is clean and stable.
Posted in Branagh
Tagged Satellite Test, Satellite transmission, Transmission status
Comments Off on Branagh Theatre Live Main Transmission
Branagh Theatre Live: “A Winters Tale” Test am 26th
The Test will start at 1100GMT/1200CET and will be for 60′. It will be on IS-1002 and IS-905. There are replacement elements from yesterday’s test. Please not that on the 5.1 channel-ident part there are some clicks as the speaker … Continue reading
Posted in Branagh, Uncategorized
Tagged Satellite Test, Satellite transmission, Transmission status
Comments Off on Branagh Theatre Live: “A Winters Tale” Test am 26th
Kenneth Branagh Theatre Company: “A Winters Tale” Test 25th November
UPDATE 1200GMT: The Test has now ceased. Please come back at 1100GMT tomorrow. UPDATE 1107GMT: Feeds on IS1002 and IS905 are now up and stable. The Test on IS-1002 and IS-905 starts at 1100GMT/UK (1200CET/W.Europe) and is of 60′ duration. … Continue reading
Posted in Branagh, Uncategorized
Tagged Satellite Test, Transmission status
Comments Off on Kenneth Branagh Theatre Company: “A Winters Tale” Test 25th November
Met Opera – Lulu TX
Services ceased 21:45GMT – Clean & stable TX Content concludes 21:42GMT 16:11GMT. All European feeds up, stable & correct The tuning period begins at 16:00GMT (UK) / 17:00CET
Posted in Met Opera
Tagged Satellite transmission, Transmission status
Comments Off on Met Opera – Lulu TX
Met Opera – Tannhauser – TX
Services ceased at 20:55GMT – Clean & stable TX Content concludes at 20:49GMT All services established & stable at 14:30GMT The tuning period begins at 14:30GMT (UK time) / 15:30CET
Posted in Met Opera
Tagged Satellite transmission, Transmission status
Comments Off on Met Opera – Tannhauser – TX
Met Opera: La Boheme TX
Services ceased at 20:20GMT Content concludes at 20:16GMT Brief interruption to IS10-02 services at 16:05GMT/17:05BST/18:05CEST as HPA filters reconfigured and optimised at teleport Eutelsat 5Wa services reconfigured at 15:24GMT/17:24CEST to correct Humax / Topfield issue All European services established and stable … Continue reading
Posted in Met Opera
Tagged Satellite transmission, Transmission status
Comments Off on Met Opera: La Boheme TX