Transmission ceased at 22:07GMT – Clean & stable throughout content
Content concludes at 22:01GMT
There is a fog effect at about 40 minutes into the first act. Do not adjust your sets
17:40GMT vision disturbance noted on IS905 & Eu7a
17:10GMT slight vision disturbance as WIN switch between transatlantic paths
16:46GMT EU5Wa resolved. Remux fault cleared at WIN
16:30GMT Several callers unable to lock to EU5Wa – investigating
16:05GMT pictures to line on IS10-02
16:00GMT: IS10-02 carriers established – currently no pictures, will switch content to line shortly
Lets hope that you all have your antenna perfectly aligned as its likely there will be significant rain fade this afternoon, especially in the West of the UK.
The tuning period for today’s transmission will begin at 16:00GMT/17:00CET
Follow CBS_Satfacts on Twitter
My Tweets-
Recent Posts
- Met Opera “EUGENE ONEGIN” 2nd May 2026 (and Encore for UK-only 5th May)
- Royal Ballet and Opera “The Magic Flute-Live” 21st April 2026
- Royal Ballet and Opera “SIEGFRIED- Live” 31st March 2026
- BTS WORLD TOUR ‘ARIRANG’ LIVE VIEWING IN GOYANG & TOKYO 11th and 18th April
- Met Opera “Tristan und Isola” 21st March 2026
Previous Productions
Search Content
Meta
Previous Production’s Info